What we think

Independent, vendor-neutral engineering work — published so clients can assess the thinking before they commission it. Full papers on request.

Market-view papers

A Modular Communications Architecture for Critical Infrastructure

How utilities evolve from private LTE and 450 MHz to 5G RedCap, NTN and 6G — a global perspective, 2026–2045.

Utility communications look fragmented — private LTE, 450 MHz, fiber, LPWAN, RedCap, satellite. This paper argues the fragmentation is only on the surface: the winning design is not any single radio generation but a modular, function-driven architecture, where each layer is matched to what the application needs and the radio becomes a replaceable block rather than a generational commitment. A utility sees whether its path builds continuous modernization or a hidden forklift replacement. A vendor sees where its product fits the architecture — and where it does not.

→ Request the full paper

Deterministic Communications and Modern Protection Coordination

Why the collapse window has compressed from minutes to seconds — and what that demands of the network.

As inverter-based resources displace synchronous generation, cascade timelines have compressed by two orders of magnitude; the decisive final cascade of the April 2025 Iberian blackout unfolded in approximately eight seconds. From cascade physics — not vendor preference — this paper derives a sub-10-millisecond bound for transmission protection coordination and explains why statistical cellular bearers cannot meet that requirement by themselves. The analysis draws on a dozen real events, including Iberia, Chile, Czechia, three Brazilian cases, Paraguay and the Dominican Republic. The finding that recurs is clear: monitoring is not coordination. In several events, instability was detected and action was taken — what was lost was the time available for coordination.

→ Request the full paper

Placing your network — or your product — inside these findings, against your spectrum and regulatory context, is the work of our Independent Technical Advisory practice.


Industry contributions

Modernizing Without Forklifts · proposed for the UTC Journal

The installed base is an asset-management decision — retain, integrate or succeed a network on condition, risk and performance, not on equipment age or a vendor’s roadmap.

One Grid, Many Spectrum Paths · proposed for CIGRE ELECTRA

Spectrum policy is national and diverges; propagation physics and grid traffic are universal and do not. Spectrum is the long-lived asset; the air interface is not.


Presented and published through international technical forums as part of our Executive Education & Knowledge Transfer practice.


Request the full paper

Fill in the form and we'll email you the paper within one business day.

Which paper?
What prompted your interest?
Scroll to Top